Watertown Collection System Improvements, Watertown, SD
Clark Engineering has an ongoing relationship with the City of Watertown assisting the City with waste water replacement and rehabilitation projects. The City currently has a $400,000 Clark project under construction to replace approximately 3,500 feet of sewer main using traditional open-cut technique. Clark is currently designing a $400,000 rehabilitation project to repair approximately 6,500 feet of sanitary sewer mains utilizing NO-DIG-TECHNOLOGY at considerable cost savings when compared to conventional open-cut techniques. Both of these projects have State Revolving Fund Loans. Clark staff designed and oversaw the rehabilitation of over five miles of existing sewer lines around Lake Kampeska. The $500,000 project included lining of sewer mains from manhole to manhole, partial linings, and point repairs as well as video inspection and cleaning. No-Dig rehabilitation in over $1,000,000 savings as compared to traditional open-cut methods of sewer construction.
|